Let us take a step back and look at the process of manufacturing a solar inverter, which goes through assembly and comes to quality control.
Then, panel performance is tested through what is called performance ratios, or PR, and this is calculated during operation and what was defined in the contract.
The first of these tests, the second being a year after installation, is going to be referred to as the Provisional Acceptance Certificate (PAC).
When you see this on your solar panel inverter component, it should bring you peace of mind, knowing that it passed QC and post-testing checks.
What is PAC Short For?
As mentioned in the section before, PAC is short for Provisional Acceptance Certificate. There will be quality control checks for all manufacturing and production items leaving factories, no matter what the product.
Solar panel, and power system equipment, is no exception, and the PAC is just a Quality Control check to ensure the company fulfills its output promises to the customer.
This test will also ensure that the home or commercial building is set up correctly and has a functioning solar panel power station. If you have a unit without one of these seals, be sure to have one conducted by the solar panel construction crew.
What Does it Mean?
As alluded to in the sections above, there is going to be a test taken to ensure that the customer’s new solar panel collection station is delivering the performance quota that was promised by the provider and installation company.
The PAC is a certification stating that the components installed will work properly. A second ‘PAC’ test will be taken a year later (and each year after, for best results), but the first test will be referred to as a PAC.
What Can PAC Readings Tell You?
The readings and data collected during the testing of the solar panel system will tell the technician the output and flow information for the particular setup in question.
For example, there will be information on the efficiency of the solar panels, the capabilities of the controller and inverter units, the storage capacity of the batteries, and other power flow information depending on the building’s electricity grid.
The test’s primary reason is to determine if the solar panel system is up to par and passes the standards set for these power stations.
What is the Ideal PAC Reading?
The readings are generally rated in percentages, which tells you how effectively your solar panel inverter system works.
The PAC rating of one hundred percent would be ideal, but anything in the upper eighties to ninety percent range will be considered working in excellent condition.
The PAC readings and testing can be performed throughout the year, monitored, and recorded through the right computer programs and system components at the owner’s convenience.
Doing this will help ensure the most efficient collection and storage of solar power.
Common Mistakes in reading a PAC result:
- Misinterpreting the information – These readings can be confusing and even frustrating to understand, be sure to have an expert conduct the test and explain the results to avoid this mistake.
- Forgetting to have the test taken – To be real, smaller companies will offer deals that might skip a certification step or two to get components ready for customers. Make sure the installation team conducts a PAC after installation is completed.
- Thinking you can do it alone – Everyone needs help occasionally, so do not make the mistake of trying to certify your inverter without expert help.
Final Thoughts on What does PAC mean on a Solar Inverter
Making sure your equipment works is going to be an instinct for those using solar as a power means.
PAC testing is a standard procedure for solar panel system setups, which is to keep the company’s promise and reassure the customer that the system is what they were promised.
There will be temptations to get secondhand gear or to do the work yourself, but the experts will agree that you should hire a technician to perform the test or have the contractor help perform the test with their crew.
Leave a Reply
You must be logged in to post a comment.